Dynamic-air-removal testing
If the facility uses a dynamic-air-removal sterilizer, check that an air-removal test (Bowie-Dick) is performed daily in an empty sterilizer before processing, as applicable to the equipment and adopted process.
Traymorrow · LRS SPS LLC - Sterile Processing Solutions
A practical review guide for sterile processing teams preparing for a facility inspection or operational assessment.
This resource is for preparation. It does not certify compliance, determine which rules apply to a facility, or replace an inspection, accreditation survey, or operational assessment.
Preparation checklist
Use the source links on each item to check the underlying guidance.
Your progress
Tracking progress is not proof of compliance or a substitute for facility-specific assessment.
Review the evidence that equipment and each sterilization process perform as intended.
If the facility uses a dynamic-air-removal sterilizer, check that an air-removal test (Bowie-Dick) is performed daily in an empty sterilizer before processing, as applicable to the equipment and adopted process.
For a CMS-participating ASC, verify a biological indicator is used at least weekly for each sterilizer and with every load containing implantable items, with results documented. Follow any additional applicable requirements.
Review routine equipment inspections, preventive maintenance, service records, and a clear path for raising process or device concerns with the manufacturer. Use manufacturer recommendations and the facility’s applicable standards to set the work and frequency.
Where the facility’s adopted standard and validation protocol call for it, include residual protein, hemoglobin, and total organic carbon (TOC) in cleaning assessment. Evaluate reusable-device condition and end of life using risk and observed function; do not substitute an unsupported universal cycle count.
Make role expectations, demonstrated competency, and ongoing learning easy to review.
Keep current role descriptions, orientation, competency assessments, and follow-up training records for staff performing reprocessing tasks. Align requirements with facility policy, applicable law, and the standards or accreditation program the facility follows.
Check which credentials are required by the facility’s jurisdiction, employer, contract, or accreditor; do not assume an HSPA credential is universally required. For HSPA-certified staff, track renewal and continuing education, including updates to standards and guidance.
Identify experienced sterile-processing leaders who can observe work, coach staff, respond to questions, and mentor developing team members. Include communication with infection prevention, clinical teams, and equipment support where relevant.
Follow the device instructions from point of use through inspection and cleaning.
For a CMS-participating ASC, check that items are pre-cleaned according to the manufacturer’s instructions or, when instructions are not provided, evidence-based guidelines before sterilization.
For a CMS-participating ASC, verify devices are visually inspected for residual soil and re-cleaned as needed before packaging and sterilization. Record and resolve recurring cleaning issues under the facility’s quality process.
Maintain a point-of-use soil-management process and transport workflow that protects staff and devices and follows applicable IFUs. Joint Commission guidance for immediate-use steam sterilization (IUSS) states that cleaning and transport steps are not omitted when IUSS is used.
CDC recommends performing most cleaning, disinfection, and sterilization of patient-care supplies in a central processing department to make quality control easier. Review any processing performed elsewhere for consistent training, monitoring, and handling controls.
Check that each item follows its instructions and that load monitoring is complete.
For a CMS-participating ASC, verify a chemical (process) indicator is placed correctly, as described in the manufacturer’s instructions, in the instrument packs in every load.
Review the complete facility workflow from decontamination and cleaning through inspection, sterilization, and storage. Check device and equipment IFUs at the relevant steps; use the appropriate validated process for each device and intended use.
Confirm procedures use an evidence-based approach and follow applicable device instructions, adopted standards, and facility policies. For outsourced or centralized services, include processing controls and instrument integrity during interfacility transport in the review.
Check work-area conditions, procedure capacity, and the limits around emergency processing.
Review the applicable temperature and humidity parameters separately for decontamination, prep and pack, and sterile storage. If the facility declares conformance with a standard, confirm that each location performing sterile processing follows that standard consistently. The governing facility standard and local requirements determine the values; do not treat one area’s target as universal across the SPD.
For CMS-participating ASCs, review operating-room temperature, humidity, and airflow against nationally accepted guidelines, applicable IFUs, and state or local rules; keep records of the facility’s monitoring and adopted range. CMS’s ASC survey manual cites ASHRAE 170’s 20–60% RH range as an example. Separate CMS hospital/CAH guidance describes a 35% baseline and an elected categorical waiver allowing eligible hospitals and CAHs to use a 20% minimum, and recommends an upper RH of 60% or less. CMS clarifies that ASCs do not need that waiver to use lower RH, but must follow IFUs for OR supplies and equipment. Do not apply the hospital/CAH waiver as an ASC requirement.
For a CMS-participating ASC, compare instrument-set quantities with expected daily procedure volume and the time needed for appropriate cleaning and sterilization.
CMS requires a CMS-participating ASC to have equipment for rapid emergency sterilization available on-site when sterility has been compromised. Emergency sterilization is not the routine method between cases. CDC says implant flash sterilization is limited to unavoidable cases and must not be used for convenience, time-saving, or insufficient instrument inventory.
Make load documentation, package condition, and storage controls reviewable.
For a CMS-participating ASC, maintain current documentation for each sterilization device, including results from each load. Prepare a way to relate processed sets to the relevant load record under the facility’s applicable standards and policies. This guide does not assert that bidirectional patient-level tracking is required.
Use the facility’s approved storage and shelf-life policy, manufacturer labeling, and applicable requirements. Under CDC’s event-related guidance, shelf life depends on packaging quality, storage, transport, handling, and events that compromise package integrity; do not apply a universal fixed duration without a basis.
CDC recommends a well-ventilated sterile storage area protected from dust, moisture, insects, and temperature or humidity extremes. Check that facility conditions also follow applicable construction rules and manufacturer storage instructions.
CDC recommends labels identifying the sterilizer, cycle or load number, sterilization date, and expiration date when applicable. Inspect packages before use; torn, wet, punctured, or otherwise compromised packages should be reprocessed. CMS’s ASC worksheet also asks facilities to reprocess compromised sterile packages.
Facility support
Contact LRS SPS LLC - Sterile Processing Solutions through Traymorrow’s existing facility request form.
Make a facility requestPrimary sources
This page summarizes cited material. Consult the current standard, rule, manual, or accreditor publication that applies to your facility.
AAMI. Understanding What Sterile Processing Needs from HTM Professionals
Overview of reprocessing stages and area-specific environmental parameters.
AAMI. Study Illuminates Industry Blind Spot for Reusable Device End of Life
Discusses ST98 residual-soil measures, risk-based end-of-life evaluation, inspection, and communication.
AAMI. Sterilization Standards FAQs
AAMI reference point for locating applicable sterilization standards and topics.
HSPA. Certification, continuing education, and leadership
HSPA resources describe certification renewal, continuing education, current practice updates, and leadership development topics.
CMS. QSO-22-16-ASC: Infection Control Worksheet
CMS survey worksheet for ASC infection-control practices, sterilization indicators, load records, and package integrity.
CMS. State Operations Manual, Appendix L, and CMS RH waiver memo
ASC requirements for records, procedure-volume equipment, emergency equipment, and RH; the separate waiver memo clarifies its eligibility.
The Joint Commission. Instrument Reprocessing — Immediate-Use Steam Sterilization
Joint Commission FAQ on IUSS, IFUs, cleaning and transport steps, avoiding convenience use, and staff competency.
The Joint Commission. Centralized processing, sterile storage, and applicable standards
Joint Commission materials on interfacility transport, evidence-based processing, storage integrity, and applicable law and standards.
ASCA. CDC Infection Prevention Checklist for Outpatient Settings
ASCA’s listing explains that the checklist supports infection-prevention policies, procedures, supplies, and systematic review of staff practices.
CDC. Sterilizing Practices
CDC evidence-based recommendations on central processing, process verification, Bowie-Dick tests, and the reprocessing cycle.
CDC. Recommendations for Disinfection and Sterilization in Healthcare Facilities
CDC guidance on implant flash sterilization, sterile storage, load labels, shelf life, and package inspection.